General In Progress

40m³ Pressed Steel Water Tank on 12m High Steel Tower

Njoro, Nakuru County, Kenya | Expected Completion: 2026-06-30

16 % Complete

Started May 2026

Project Overview

Technical Specifications Tank Details. The system comprises a 40 cubic meter (40m³) pressed steel tank of modular bolted/panel construction, fabricated from hot-dip galvanized pressed steel panels with a typical thickness of 3mm to 5mm depending on course height. The tank has an approximate diameter of 3.5m to 4.0m and a height of 3.5m to 4.0m, designed for elevated water storage with a total system capacity suited for medium-scale community or institutional supply. Tower Details. The tank is supported on a 12-meter high steel lattice/frame tower constructed from structural steel (typically ASTM A36 or equivalent). The tower features a 4-leg or multi-leg braced steel frame configuration and is anchored to a reinforced concrete pad/raft foundation with embedded anchor bolts, ensuring structural stability and resistance to wind and seismic loads at elevation. Foundation Requirements. Foundation design follows proven standards from comparable regional projects, including the Tana Water Works Development Agency installations. The foundation consists of a reinforced concrete raft/pad foundation with a minimum concrete grade of C25/C30 and steel rebar mesh reinforcement as per structural design. A geotechnical survey is required to verify soil bearing capacity prior to construction. The anchor bolt system is embedded into the foundation with precise alignment and leveling to receive the tower legs. Scope of Work — Foundation Preparation. The foundation preparation works include: (1) Site Clearing & Excavation — clearing vegetation and topsoil, excavating to the designed foundation depth, and ensuring a level base; (2) Subgrade Preparation — compacting the subgrade to 95% modified Proctor density and installing a 50mm lean concrete blinding layer where required; (3) Reinforcement Works — cutting, bending, and fixing reinforcement as per structural drawings, and installing anchor bolt templates for the tower legs; (4) Formwork — erecting formwork for the foundation pad and pedestal columns where applicable; (5) Concrete Works — pouring and vibrating concrete to the specified grade, with a minimum curing period of 14 days or as specified by the engineer; and (6) Anchor Bolt Installation — setting anchor bolts to precise alignment and level, and allowing the concrete to achieve its design strength before tower erection commences.

Project In Progress

This project is currently under construction. Our team is working diligently to deliver quality results.

Expected: 2026-06-30 16% Complete

Technical Specifications

Project Size

2,500 sq meters

Duration

3 months

Team Size

15 workers

Certification

ISO 9001:2015

Materials & Equipment

Galvanized Steel Bolts & Fasteners Welding Equipment Protective Coating

Project Timeline

Planning & Design

Week 1-2

Site assessment, measurements, and technical drawings

Fabrication

Week 3-6

Steel cutting, welding, and quality control

Transportation

Week 7

Safe delivery to project site

Current: Installation

In Progress

On-site assembly currently underway

Project Details

Location

Njoro, Nakuru County, Kenya

Expected Completion

2026-06-30

Progress

16% Complete

Category

General

Client

Njoro, Nakuru County, Kenya

Want a similar project?

Get a free quote for your engineering needs.

Share This Project

Similar Projects

Thidi Water Project - 24m3 Solar Powered Water Supply
General

Thidi Water Project - 24m3 Solar Powered Water Supply

Grand commissioning of the Thidi Water Project, featuring a 24 cubic meter water storage tank elevat...

Thidi, Kenya View Details
24m3 Nairobi Ruaraka
General

24m3 Nairobi Ruaraka

24m3 Nairobi Ruaraka With 15 solar modules of 475watts...

Nairobi Ruaraka View Details
Mashuru project 12m 50m3 For Commercial purposes
General

Mashuru project 12m 50m3 For Commercial purposes

Mashuru project 12m 50m3 For Commercial purposes...

Operation successful!